Brick Stabilisation at Montague Court

MGM have been employed to erect a low level scaffold to undertake investigation works to a structural floor slab of one of the flats.  Following our investigation, structural repairs which involved filling existing cracks to the concrete floor slab and installation of cavity trays.   We were then instructed to increase the scaffold to the full height of the building to carry out further investigation works at every level.   This raised a potential issue in regards to the existing wall ties and one of MGM’s structural surveyors carried out a survey of the full elevation for the design team.